Table 2. Within-session reliability of the key outcome variables.
Outcome variables Relative reliability Absolute reliability
ICCs (95% CI) ICCa (95% CI) TE (95% CI) CV (95% CI) SWC (95% CI)
5 m time (s) 0.81 (0.65-0.91) 0.93 (0.85-0.97) 0.02 (0.01-0.02) 1.23 (0.98-1.37) 0.01 (0.00-0.01)
10 m time (s) 0.89 (0.77-0.94) 0.96 (0.91-0.98) 0.02 (0.02-0.02) 0.90 (0.79-0.96) 0.01 (0.00-0.01)
20 m time (s) 0.77 (0.62-0.87) 0.91 (0.83-0.95) 0.03 (0.02-0.03) 0.84 (0.68-0.95) 0.01 (0.01-0.01)
30 m time (s) 0.85 (0.74-0.92) 0.94 (0.89-0.97) 0.06 (0.05-0.07) 1.34 (1.17-1.46) 0.02 (0.02-0.02)
F0 (N/kg) 0.71 (0.49-0.85) 0.88 (0.74-0.94) 0.23 (0.16-0.28) 3.41 (2.37-4.09) 0.07 (0.05-0.08)
V0 (m/s) 0.74 (0.58-0.86) 0.90 (0.81-0.95) 0.22 (0.17-0.26) 2.36 (1.85-2.74) 0.06 (0.05-0.07)
Pmax (W/kg) 0.90 (0.80-0.95) 0.97 (0.92-0.98) 0.35 (0.31-0.37) 2.20 (1.95-2.32) 0.10 (0.09-0.10)
FV Slope 0.48 (0.26-0.69) 0.74 (0.51-0.87) 0.05 (0.03-0.07) 6.98 (3.70-9.96) 0.01 (0.01-0.02)
RF max (%) 0.86 (0.73-0.93) 0.95 (0.89-0.98) 0.01 (0.00-0.01) 1.29 (1.09-1.40) 0.00 (0.00–0.00)
DRF (%) 0.47 (0.24-0.68) 0.72 (0.49-0.86) 0.00 (0.00-0.01) 7.25 (3.73-10.5) 0.00 (0.00–0.00)
Max. Speed (m/s) 0.77 (0.62-0.88) 0.91 (0.83-0.96) 0.16 (0.13-0.19) 1.92 (1.55-2.18) 0.03 (0.02-0.04)
ICCs – intraclass correlation coefficient (single measures); ICCa – intraclass correlation coefficient (average measures); CI – confidence interval; TE – typical error; CV – coefficient of variation (%); SWC - smallest worthwhile change; F0 - theoretical maximal force; V0 - theoretical maximal velocity; Pmax - maximal power; FV slope - slope of the force–velocity relationship; RFmax - maximal ratio of horizontal-to-resultant force. DRF - decrease in the ratio of horizontal-to-resultant force.